Friday 26 August 2016

Week 5 Update

Another busy week on the build site, check out the latest update from our project manager ...







Friday the 26th of August

“The recent mild and dry winter weather conditions have helped HRS Construction make good progress with the construction of the New Learning Hub.  The first floor steel frame was erected during the first week in August and the timber framing for the outside walls are now complete (refer to photos above).  After scaffold edge protection is installed, the steel reinforcement for the suspended first floor slab will be placed.  The concrete slab will then be poured starting very early one morning early to mid-September.  After the concrete has ‘cured’ for around one week (as concrete gains strength over time), the steel framing for the first floor and roof will be craned into position.  The design team (influenced by the school’s cultural narrative) has now selected the interior wall, floor and ceiling colours based on the colours of the KererÅ« (New Zealand wood pigeon) and there is only another four months left to go until the New Learning Hub is completed.”
David Kolien, Project Manager


Monday 22 August 2016

Week 3 & 4 Term Three


Week 4
As soon as the structural steel was secured in place, the timber framing was put up.  The team are now preparing the first floor with the installation of concrete beams to support the concrete floor.




Week 3
Early this week we had a crane on site and parked up on Hackthorne Rd lifting into place all of the structural steel for the ground floor.










Tuesday 2 August 2016

Week Two Term Three

Things are now happening so fast that we are struggling to keep our blog up to date! To see what is happening now visit the live snowgrass webcam

This week we have had concrete and steel delivered, check out the photos below.

Below are a few photos courtesy of Sonny Sun, our MOE Property Advisor.